PSB Events Tally

User Tag List

Page 724 of 724 FirstFirst ... 224624674714720721722723724
Results 14,461 to 14,468 of 14468

Thread: For funny emails/jokes/vids/pics - that dont deserve their own thread

  1. #14461
    Member Halo_2's Avatar
    Join Date
    Jun 2005
    Location
    From Where You'd Rather Be
    Motorbike
    Expensive Espresso Machine
    Liked
    389 times
    Posts
    6,958
    Post Thanks / Like
    Mentioned
    29 Post(s)
    Tagged
    0 Thread(s)
    Number 3 is good too

    RiDe F@sT.. HaVe F).. PlAy Ld

  2. #14462
    Member Hillz's Avatar
    Join Date
    Sep 2010
    Location
    Mundaring
    Motorbike
    ZX10R, DRZ400SM
    Liked
    0 times
    Posts
    1,170
    Post Thanks / Like

    Mentioned
    11 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by Hillz View Post
    causing trouble for no reason haha, speed sign along my route


    sign is useless... didn't even trigger on the bike this morning
    Hoonaholics Garage

  3. #14463
    Member gareth_oau's Avatar
    Join Date
    Apr 2017
    Location
    Perth
    Motorbike
    Ducati
    Liked
    0 times
    Posts
    119
    Post Thanks / Like
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by Para045 View Post
    Are they just as bad as the big yellow fuckers they put in roadworks zones? Those things are almost never correct, they had one in Gidgegannup a while back and withing a week went from having me doing 13kmh under to 22kmh over while doing the 60kmh limit

    Trouble is you then get the idiots that take them for granted and trust them over their speedo

    I don't understand why the normal speed limit doesn't resume until around 500m after the roadworks have finished.

    why not say 10m?

    are they worried that I'm so traumatised by the roadworks that its going to take me another 490m to recover sufficiently before I can resume normal speed duties?

  4. #14464
    Member Alternate's Avatar
    Join Date
    Aug 2016
    Location
    NOR
    Motorbike
    -
    Liked
    0 times
    Posts
    112
    Post Thanks / Like
    Mentioned
    1 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by gareth_oau View Post
    I don't understand why the normal speed limit doesn't resume until around 500m after the roadworks have finished.

    why not say 10m?

    are they worried that I'm so traumatised by the roadworks that its going to take me another 490m to recover sufficiently before I can resume normal speed duties?
    A few years ago they coned off an entire lane for about 2 kms before roadworks began and made it 40km the whole way. I think it was for bridge works just outside of Bunbury. Then, just to be arseholes, cops parked up about 3/4 of the way through so when people got the shits and sped up because there was no actual work around they got pinged.

  5. #14465
    Member shan's Avatar
    Join Date
    May 2007
    Location
    Above you
    Motorbike
    Big bang boom and a sewing machine
    Liked
    2533 times
    Posts
    9,693
    Post Thanks / Like
    Mentioned
    17 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by Alternate View Post
    A few years ago they coned off an entire lane for about 2 kms before roadworks began and made it 40km the whole way. I think it was for bridge works just outside of Bunbury. Then, just to be arseholes, cops parked up about 3/4 of the way through so when people got the shits and sped up because there was no actual work around they got pinged.
    If you know the rules and regs its near impossible to book someone for such, 99% of roadside signage is wrong and will not stand up to a court,
    Cops get away with our lethargy and ignorance as much on their side as crispy creams are.
    REPENT MOTHER FUCKER
    (anarchy in english )
    Likes Para045 liked this post

  6. #14466
    Member BOFH's Avatar
    Join Date
    Feb 2012
    Location
    Perth, Western Australia, Australia
    Motorbike
    2009 V-Star 250
    Liked
    1372 times
    Posts
    3,058
    Post Thanks / Like
    Mentioned
    17 Post(s)
    Tagged
    0 Thread(s)
    The correct number of bikes to own = N + 1, where N is the current number of bikes you own.

  7. #14467
    Member Hillz's Avatar
    Join Date
    Sep 2010
    Location
    Mundaring
    Motorbike
    ZX10R, DRZ400SM
    Liked
    0 times
    Posts
    1,170
    Post Thanks / Like

    Mentioned
    11 Post(s)
    Tagged
    0 Thread(s)
    those were the days, loan up & go wherever

    Hoonaholics Garage

  8. #14468
    Member Para045's Avatar
    Join Date
    Oct 2006
    Location
    City of Wanneroo
    Motorbike
    98 TITANIUM CBR1100XX SUPERBLACKBIRD
    Liked
    1150 times
    Posts
    14,828
    Post Thanks / Like
    Mentioned
    61 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by gareth_oau View Post
    I don't understand why the normal speed limit doesn't resume until around 500m after the roadworks have finished.

    why not say 10m?

    are they worried that I'm so traumatised by the roadworks that its going to take me another 490m to recover sufficiently before I can resume normal speed duties?
    There was a time when they were actually required to put signs up advising of the speed limit returning to normal, now they usually just leave it signless till the next regular speed sign
    #1 Gold Ticket Holder for the Barfridge Fan Club
    Quote Originally Posted by Phildo View Post
    Noted. We'll check back on that one in three years
    Quote Originally Posted by filbert View Post
    i'll pretend you didn't know she was 13

    98 BADASS TITANIUM BLACKBIRD - Past bikes 1982 XS250 Yamaha & 1983 CB750F with 900 motor
    Ozblackbird.net Administrator

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •